Injection mould lead time and project process, step by step

Standard multi-cavity moulds from Ace Mould ship in 4–6 weeks from DFM approval; for large or complex moulds the lead time is confirmed in the quotation. Before that clock starts you receive a reply to your enquiry within 24 hours, DFM feedback within 48 hours of sending your 3D data, and a formal quotation typically in 2–3 business days. During the build you receive weekly progress reports with photos and videos of the tool.

Key facts

Lead time4–6 weeks from DFM approval for standard multi-cavity moulds
Reply to enquiriesReply to enquiries within 24 hours
DFM feedbackDFM feedback within 48 hours of receiving 3D data
QuotationFormal quotation typically in 2–3 business days
Progress reportsWeekly progress reports with photos and videos of the tool
Payment termsMoulds: 30% with PO, 40% at T0 trial, 20% before shipment, 10% net 30 days (alternatives: 50/50; 35/35/30; net 30; T/T 30 days after delivery)
Mould trialEvery mould is trialled before shipment
Documents with each mouldDFM feedback · Mould-flow analysis · Cooling report · Full dimensional report · First-article samples · Trial report
DeliveryDAP or DDP to your plant, or FOB / EXW from South China ports (Shenzhen, Hong Kong); full commercial documents for EU / UK import under your EORI number
What we need for a quotation3D files (STEP, IGES or STL); 2D drawings with critical dimensions, tolerances and surface finish; plastic material; estimated annual volume; other requirements such as steel grade, hot runner preference and colour

The milestones, and what we commit to at each

The lead time is counted from your DFM approval, not from the first enquiry. These are the milestones of a mould project and what you can hold us to:

MilestoneOur commitment
NDASigned before any drawings or 3D data are exchanged.
EnquiryWe reply within 24 hours.
DFM feedbackWithin 48 hours of receiving your 3D data.
QuotationA formal quotation typically in 2–3 business days — in USD, price basis EXW Dongguan / Hong Kong, valid for 30 days.
Purchase orderUnder our standard terms, 30% of the mould price is due with the order.
DFM approvalYour approval starts the lead time. Mould-flow analysis and the cooling report are part of the design.
Machining and assemblyCNC and EDM machining, then mould assembly. You receive weekly progress reports with photos and videos of the tool.
TrialEvery mould is trialled before shipment. 40% of the mould price is due at the T0 trial.
ShipmentStandard multi-cavity moulds ship in 4–6 weeks from DFM approval, with a full dimensional report, first-article samples, a trial report and the cooling report. 20% is due before shipment, 10% net 30 days.
DeliveryDAP or DDP to your plant, or FOB / EXW from South China ports (Shenzhen, Hong Kong).

What decides the lead time of a mould

  • Size and complexity: the number of cavities and the mould actions — sliders, lifters, unscrewing mechanisms.
  • How quickly the DFM is approved. The clock starts with your approval, so open questions on the part cost calendar time.
  • Bought-in items with their own delivery time, such as the hot runner system.
  • The amount of EDM: every electrode has to be designed, machined and used, so fewer electrodes mean less time.
  • Changes to the part after approval.
  • The number of trial rounds needed before you accept the samples.
  • Transport and customs: add them to your launch plan — they are not part of the 4–6 weeks.

How our engineering shortens the engineering phase

Electrodes and CNC programs are prepared with our own in-house AI system, which is in use on our mould projects, so machining starts sooner. The system mills first and uses EDM only where a cutter cannot reach, which keeps the number of electrodes low. Every result is reviewed by an engineer and verified in Siemens NX before it reaches a machine.

We do not publish a figure for the time saved. The lead time we commit to is the one in your quotation.

What we need from you to keep to the dates

  • 3D files (STEP, IGES or STL) and 2D drawings with critical dimensions, tolerances and surface finish.
  • The plastic material and the estimated annual volume.
  • Other requirements: steel grade, hot runner preference, colour.
  • A prompt answer to the DFM feedback — the lead time starts with your approval.

After shipment

The mould is yours from final payment. We give after-sales technical support for all our moulds, in several languages, and engineering changes, spare inserts and repeat moulds are produced from the same verified data as the original mould.

How it is verified

  • The lead time and the payment milestones are written in your quotation.
  • Weekly progress reports with photos and videos of the tool show where the mould stands.
  • Every mould is trialled before shipment and ships with a full dimensional report, first-article samples, a trial report and the cooling report.

Frequently asked questions

How long does it take to make an injection mould in China?

It depends on the size and complexity of the mould and on when the clock starts. Our standard multi-cavity moulds ship in 4–6 weeks from DFM approval; for large or complex moulds the lead time is confirmed in the quotation. Add transport and customs time.

From which date is the lead time counted?

From your DFM approval — not from the enquiry and not from the purchase order.

How quickly do you answer an enquiry and quote?

We reply within 24 hours, send DFM feedback within 48 hours of receiving your 3D data, and a formal quotation typically in 2–3 business days.

How are we kept informed during the build?

With weekly progress reports that include photos and videos of your tool.

What are the payment milestones for a mould?

Our standard terms are 30% with the purchase order, 40% at the T0 trial, 20% before shipment and 10% net 30 days. Alternatives are 50/50, 35/35/30, net 30, or T/T 30 days after delivery.

Does automation shorten your lead time?

Our own AI system prepares electrode designs and CNC programs — both in use on our mould projects — so machining starts sooner. We do not publish a figure for the time saved; the lead time we commit to is stated in the quotation.