Injection moulding production, assembly and packaging
Besides building moulds, Ace Mould runs injection moulding production in Dongguan, China: 14 injection presses from 60 to 250 tonnes, all with robots and conveyors, in small and large series, plus product assembly, packaging and shipping. Our ISO 9001:2015 certificate covers mould production and, for plastic products, plastic accessories for sports goods and household appliances. It is not ISO 13485, and cleanroom moulding is not part of the services listed on this website.
Key facts
| Moulding floor | 14 injection presses, 60–250 tonnes, all with robots and conveyors |
|---|---|
| Production services | Injection moulding production in small and large series, plus product assembly, packaging and shipping |
| Plastics processed | PP · HDPE · LDPE · ABS · PS · HIPS · PC · PC/ABS · PMMA · PET / rPET · Tritan · Surlyn · PA6 · PA66 · PA12 · POM · TPE · TPU · PVC · PPS · PPA · PEI · LCP · PEEK |
| Trial capacity | 60–250 tonnes in-house; 90–3,300 tonnes on partner presses |
| Tooling ownership | The customer owns the mould from final payment; Ace Mould stores and maintains it for production, or ships it on request |
| Delivery | DAP or DDP to your plant, or FOB / EXW from South China ports (Shenzhen, Hong Kong); full commercial documents for EU / UK import under your EORI number |
| Quotation | Quotes in USD, price basis EXW Dongguan / Hong Kong, valid 30 days |
| Factory visits | Factory visits and supplier audits are welcome at the Dongguan site |
What we mould, and on which machines
The moulding floor has 14 injection presses from 60 to 250 tonnes, including FANUC machines. All presses have robots, automated unloading and conveyors. We run small and large series.
Parts that need a press above 250 tonnes are outside our own moulding floor. We still build and trial such moulds — on partner presses from 90 to 3,300 tonnes — and ship the mould to you or to the moulder of your choice.
Household-appliance parts we make moulds for include vacuum cleaner and washing machine parts, refrigerator shelves, fan blades and control panels.
Plastics
PP, HDPE, LDPE, ABS, PS, HIPS, PC, PC/ABS, PMMA, PET and rPET, Tritan, Surlyn, PA6, PA66, PA12, POM, TPE, TPU and PVC, and the engineering grades PPS, PPA, PEI, LCP and PEEK. Glass-filled, flame-retardant and corrosive grades are supported.
Assembly, packaging and shipping
Moulded parts can be assembled, packed and shipped by us. One team covers design, engineering, mould manufacturing, moulding production, assembly, packaging and shipping — one team from the first DFM discussion to shipment.
Describe the assembly steps and the packaging you need in your RFQ.
What our ISO 9001:2015 certificate covers
Our quality management system is certified to ISO 9001:2015 — certificate no. 064-24-Q-1914-R0-S, issued by Beijing Standard Certification Centre Ltd., valid until 2027-06-06. The scope on the certificate reads, word for word: "The production of plastic hardware moulds, plastic products (plastic accessories for sports goods and household appliances) and related management activities involved."
In plain terms: mould making is covered, whatever industry the mould is for. For moulded parts, the certified scope is plastic accessories for sports goods and household appliances; moulding other kinds of parts is not within the certified scope.
The certificate is ISO 9001:2015, not ISO 13485, and cleanroom moulding is not part of the services listed on this website. For medical-device parts we build the mould; it can be shipped to your own moulder.
Mould ownership and terms when we run production
The mould is yours from final payment. While we run your production we store and maintain it; on request we ship it to you or to another moulder.
Our standard payment terms for parts are 50% before shipping and 50% upon arrival. Quotations are in USD, price basis EXW Dongguan / Hong Kong, valid 30 days. Delivery is DAP or DDP to your plant, or FOB / EXW from South China ports (Shenzhen, Hong Kong).
How it is verified
- The certificate number, issuer, validity and scope are shown on our company facts page; a certificate can be checked with the body that issued it.
- Factory visits and supplier audits are welcome at our Dongguan site.
- Every mould is trialled before shipment, with first-article samples and a trial report.
Frequently asked questions
Do you only build moulds, or do you also mould the parts?
Both. We build the mould and can run injection moulding production in small and large series, plus product assembly, packaging and shipping.
What size of press do you have for production?
14 injection presses from 60 to 250 tonnes, all with robots and conveyors. Whether your part fits depends on its size, shot weight and material — send the 3D data and we will tell you.
What does your ISO 9001:2015 certificate cover for part production?
Our ISO 9001:2015 certificate (no. 064-24-Q-1914-R0-S) covers the production of moulds and, for plastic products, plastic accessories for sports goods and household appliances. Moulding other kinds of parts is not within the certified scope.
Do you mould medical parts in a cleanroom?
No. Cleanroom moulding is not part of the services listed on this website, and our certificate is ISO 9001:2015, not ISO 13485. We build moulds for medical-device parts and can ship the mould to your own moulder.
Who owns the mould if you run the production?
You do, from final payment. We store and maintain the mould for production, or ship it to you on request.
Can you assemble and pack the finished product?
Yes. Product assembly, packaging and shipping are part of our production service.
What are the payment terms for parts?
50% before shipping and 50% upon arrival.
Discuss your part
Send your 3D data (STEP or IGES) and requirements. We sign an NDA before any drawings or 3D data are exchanged.
Last updated:
