How to choose an injection mould supplier in China
Choose on evidence, not on the price alone: check that the supplier has built moulds like yours, agree which documents come with the mould, audit the factory, put confidentiality and tooling ownership in writing, tie payments to milestones you can verify, and ask from which milestone the lead time is counted. The checklist below explains each point; at the end you will find how Ace Mould answers them, with links to the evidence.
1. Check that the supplier has built moulds like yours
A mould maker that is strong in large automotive tools is not automatically right for a 64-cavity closure, and the reverse is also true. Ask for comparable projects: the part type, the number of cavities, the material, the mould class and the hot runner used. Many suppliers cannot publish customer work because of NDAs, so ask to walk through comparable projects in a call or a visit.
Ask which steps are done in-house β design, CNC machining, EDM, fitting, trials β and which are bought in. Work that is subcontracted is harder for you to follow and for the supplier to control.
2. Agree which documents come with the mould
Documents are how you check a mould before it leaves the factory. Agree the list in the quotation, not after the first trial.
| Ask for | Why it matters |
|---|---|
| DFM report before steel is cut | Draft, wall thickness, undercuts, gate position and parting line are cheap to change on paper and expensive in steel. |
| Mould-flow analysis | Shows filling, weld lines, air traps and the pressure the part needs β and whether all cavities fill alike. |
| Cooling calculation | Cooling usually decides the cycle time and part stability; ask how the circuits were sized. |
| Dimensional report | Ask what the stated tolerance applies to (steel inserts or moulded parts) and on which equipment it is measured. |
| Trial report and first-article samples | Process settings, shot weights and samples from the actual mould are your basis for approval. |
| 2D drawings and a spare-parts list | You need them for maintenance, spare inserts and for moving the mould later. |
3. Audit the factory
- Visit, or ask for a live video walk-through, and see the machines that will make your mould.
- Ask how measuring equipment is calibrated and see a real measurement report.
- Check certificates with the body that issued them, not only as a PDF.
- Check that the company name, address and registration number in the contract match the factory you audit and the supplierβs official website β marketplace listings can use a similar name.
4. Put confidentiality and tooling ownership in writing
- Sign an NDA before you send drawings or 3D data.
- State in the contract when the mould becomes yours (usually at final payment), where it is stored, who maintains it, and that you may move it to another moulder at any time.
- Agree who owns the design data and how spare inserts and repeat moulds will be made.
5. Tie payments to milestones you can verify
Split the price across steps you can check β order, first trial, sample approval, shipment β rather than paying most of it before you have seen parts from the mould. Agree what happens when trial samples are not approved: who pays for corrections and how many trial rounds are included.
6. Make the lead time realistic
- Ask from which milestone the lead time runs: purchase order, DFM approval or design approval make a difference of weeks.
- Ask how many trial rounds are included and how long a design change takes.
- Add transport and customs time to your launch plan; ask for the Incoterms (EXW, FOB, DAP, DDP) in the quotation.
7. Communication during the project
- One project manager who speaks your language and answers within a working day.
- Regular progress reports with photos or videos of your mould, not only dates.
- A clear route for engineering changes, with their cost and time impact stated before work starts.
8. Mould class, steel and warranty
Specify the mould class (for example SPI Class 101 to 104), the steel and hardness for cavities and cores, the hot runner brand, and the number of cycles the supplier commits to in writing. These decide the price more than anything else; two quotations are only comparable when they state them in the same way.
How Ace Mould answers these points
| Mould types we build | Multi-cavity moulds Β· Single-cavity moulds (prototyping, low volume) Β· Family moulds Β· Hot runner moulds Β· Insert moulds Β· Prototype moulds (aluminium or soft steel) Β· Overmoulding Β· Unscrewing moulds Β· Flip-top closure moulds with in-mould closing Β· Thin-wall packaging moulds, including IML |
|---|---|
| Cavities per mould | 2 to 128 cavities per mould |
| Documents with each mould | DFM feedback Β· Mould-flow analysis Β· Cooling report Β· Full dimensional report Β· First-article samples Β· Trial report |
| Critical dimensions | Β±0.005 mm on critical dimensions, verified on a Hexagon CMM |
| Confidentiality | NDA signed before any project data is exchanged |
| Tooling ownership | The customer owns the mould from final payment; Ace Mould stores and maintains it for production, or ships it on request |
| Payment terms | Moulds: 30% with PO, 40% at T0 trial, 20% before shipment, 10% net 30 days (alternatives: 50/50; 35/35/30; net 30; T/T 30 days after delivery) |
| Lead time | 4β6 weeks from DFM approval for standard multi-cavity moulds |
| Quotation | Quotes in USD, price basis EXW Dongguan / Hong Kong, valid 30 days |
| Delivery | DAP or DDP to your plant, or FOB / EXW from South China ports (Shenzhen, Hong Kong); full commercial documents for EU / UK import under your EORI number |
| Response times | Reply to enquiries within 24 hours |
| DFM feedback | DFM feedback within 48 hours of receiving 3D data |
| Progress reports | Weekly progress reports with photos and videos of the tool |
| Factory visits | Factory visits and supplier audits are welcome at the Dongguan site |
| Mould classes | SPI Class 101β104 for production moulds; Class 105 for prototypes |
| Tool life | 1,000,000 cycles guaranteed on SPI Class 101 moulds |
| Working languages | Chinese Β· English Β· Italian Β· Spanish |
How you can check our answers
- Visit our factory in Dongguan or ask for a video call: factory visits and supplier audits are welcome.
- We sign the NDA before any drawings or 3D data are exchanged, and share comparable projects in that conversation.
- Each mould ships with a full dimensional report, first-article samples, a trial report and the cooling report β see measurement and documentation.
- Send a past or upcoming project: we prepare a DFM and a quotation you can compare with your current supplier.
Frequently asked questions
Which documents should an injection mould supplier provide?
At least a DFM report before steel is cut, a mould-flow analysis, a cooling calculation, a dimensional report that states what was measured, a trial report with first-article samples, and 2D drawings with a spare-parts list. Agree the list in the quotation.
Who owns an injection mould made in China?
Whoever the contract says. Make sure it states that the mould is yours from final payment and that you may move it. At Ace Mould the customer owns the mould from final payment.
How are payments for injection moulds usually structured?
Tie them to milestones you can verify β order, first trial, approval and shipment. Our standard terms are 30% with the order, 40% at the T0 trial, 20% before shipment and 10% net 30 days.
How long does it take to get an injection mould from China?
It depends on size and complexity and on when the clock starts β ask whether the lead time runs from the purchase order or from DFM approval, and add shipping. Our standard multi-cavity moulds ship in 4β6 weeks from DFM approval; large or complex moulds are confirmed in the quotation.
Discuss your part
Send your 3D data (STEP or IGES) and requirements. We sign an NDA before any drawings or 3D data are exchanged.
Last updated:
