Mould design, DFM and mould-flow analysis

Ace Mould designs every mould in-house from your 3D and 2D data, in Siemens NX. You receive DFM feedback within 48 hours of sending your 3D data; mould-flow analysis and the 2D mould drawings are part of the design, and the cooling circuits are calculated and reported in a cooling report. DFM analysis and mould-flow simulation are completed before the first block of steel is cut, and our lead time is counted from your DFM approval.

Key facts

DFM feedbackDFM feedback within 48 hours of receiving 3D data
Documents with each mouldDFM feedback Β· Mould-flow analysis Β· Cooling report Β· Full dimensional report Β· First-article samples Β· Trial report
Cooling reportCooling circuits calculated as a hydraulic network β€” flow, Reynolds number per circuit, pressure drop, bottlenecks and cavity-to-cavity temperature balance β€” reported with the design
Engineering softwareSiemens NX CAD/CAM Β· Autodesk PowerMill Β· our own in-house AI system for mould making
Mould base standardsLKM Β· DME Β· HASCO Β· Meusburger Β· Misumi
Hot runner systemsHusky Β· Mold-Masters Β· Synventive Β· YUDO Β· Incoe
GatesHot tip, valve gate and open gate; cold-runner edge, submarine, pin-point, fan and banana gates
What we need for a quotation3D files (STEP, IGES or STL); 2D drawings with critical dimensions, tolerances and surface finish; plastic material; estimated annual volume; other requirements such as steel grade, hot runner preference and colour
Lead time4–6 weeks from DFM approval for standard multi-cavity moulds
ConfidentialityNDA signed before any project data is exchanged

From your data to an approved design

StepWhat happens
NDASigned before any drawings or 3D data are exchanged.
Your data3D files (STEP, IGES or STL), 2D drawings with critical dimensions, tolerances and surface finish, the plastic material, the estimated annual volume, and any requirements for steel grade, hot runner or colour.
DFM feedbackWithin 48 hours of receiving your 3D data.
QuotationA formal quotation typically follows in 2–3 business days.
Mould designIn-house, in Siemens NX CAD/CAM, including mould-flow analysis and all 2D mould drawings. Tolerance studies on request.
Cooling designCircuits are calculated as a hydraulic network; the cooling report is delivered with the design.
Your approvalYour DFM approval starts the lead time: standard multi-cavity moulds ship in 4–6 weeks from it.

What a DFM review looks at

A DFM (design for manufacturability) review checks whether the part can be moulded as drawn, before the mould is designed. These points are cheap to change on paper and expensive to change in steel:

  • Draft angles β€” whether the part releases from the mould.
  • Wall thickness β€” thick sections sink and cool slowly, thin ones may not fill.
  • Undercuts β€” which need sliders, lifters or an unscrewing mechanism.
  • Gate type and gate position β€” where the gate mark sits and how the part fills.
  • The parting line β€” where it runs and whether it will be visible.

Mould-flow analysis

A mould-flow analysis simulates how the plastic fills the cavity. It shows filling, weld lines, air traps and the pressure the part needs β€” and, in a multi-cavity mould, whether all cavities fill alike. It is part of our mould design.

Cooling: calculated and reported

Cooling is calculated, not guessed. Every circuit is engineered as a hydraulic network β€” flow, Reynolds number per circuit, pressure drop, bottlenecks and cavity-to-cavity temperature balance β€” and you receive the cooling report together with the mould design.

Where the part needs them, we use beryllium-copper inserts and conformal cooling; on high-cavitation closure moulds they have cut cycle time by 15–20%.

Mould base, standard parts, hot runner and steel

We design to the mould base standards of LKM, DME, HASCO, Meusburger and Misumi, and with hot runner systems from Husky, Mold-Masters, Synventive, YUDO and Incoe β€” state your plant standard in the RFQ.

Cavity and core steels include S136, Stavax ESR, NAK80, H13, ASSAB 8407 Supreme, 718H, 2738H, 2316 and 1.2767; production moulds are built to SPI Class 101 to 104, prototypes to Class 105.

Where our AI system is used in design β€” and where it is not yet

We state the status exactly. Our engineers decide: every result of the system is reviewed by an engineer and verified in NX before it reaches a machine.

  • In trial use and validation: the mould design model. From the approved part and cavity layout it proposes the mould base and standard parts, the cooling circuits, the ejection layout and the mould actions β€” sliders, lifters, unscrewing, hot runner. Every proposal is checked in NX geometry for interference and wall thickness before an engineer reviews it.
  • In development: automated DFM checks (draft angles, undercuts, wall thickness and the parting line from NX analysis, reported with a picture for every finding) and automated 2D drawings (assembly and component drawings, bills of materials and the standard-part list generated from the 3D model).
  • In use on our mould projects: electrode design and CNC programming, which follow the approved design.

How it is verified

  • The cooling report states flow, Reynolds number, pressure drop and cavity-to-cavity temperature balance for every circuit; you receive it with the design.
  • Every proposal of the mould design model is checked in NX geometry for interference and wall thickness, then reviewed by an engineer.
  • Send a past or upcoming project: we prepare a DFM and a quotation that you can compare with your current supplier.
  • Every mould is trialled before shipment and ships with a full dimensional report, first-article samples and a trial report.

Frequently asked questions

Do you send DFM feedback before we place an order?

Yes. Send your 3D data and you receive DFM feedback within 48 hours. You can also send a past or upcoming project: we prepare a DFM and a quotation that you can compare with your current supplier.

Is mould-flow analysis included?

Yes. Mould-flow analysis is part of our mould design.

Which file formats do you need?

3D files in STEP, IGES or STL, and 2D drawings with critical dimensions, tolerances and surface finish.

Which mould base standards do you design to?

LKM, DME, HASCO, Meusburger and Misumi. Tell us your plant standard in the RFQ.

Is the mould designed by AI?

No. Our engineers decide. Our mould design model is in trial use and validation: it proposes the mould base, standard parts, cooling circuits, ejection layout and mould actions, every proposal is checked in NX, and an engineer reviews it.

When does the lead time start?

With your DFM approval. Standard multi-cavity moulds ship in 4–6 weeks from DFM approval; for large or complex moulds the lead time is confirmed in the quotation.